Screen Line
Flooding the intake · lighting the water
Live telemetryT 00:00×1800HDGALT-- FPS
SONAR SWEEP · 66 m · 160°0jellyfish0fish0taggedmodel inflow 0
SIMER · SCREEN LINE
Team Simer presents

Screen Line

One jellyfish bloom day at a coastal plant, in sixty seconds

00:00

Screen Line

A Blue Blubber bloom day at a coastal plant's four cooling-water intakes

Team Simer · ENEC challenge, ATP 2026 · drag to orbit, right-drag to move, arrows or WASD to walk

View Tap a label to zoom in · X explodes
Light
Lens
Intakes · tap to fly there

Running the model.

Lift in use
0%
plant
On the screens
0t
per screen
Lifted out
0t
of 0 t arrived
Collagen
0kg
made so far
00:00
bloom day

Where 250 t goes

Every tonne the screens lift, followed to the sea, the drain, the collagen partner and the compost plant. Uses the bloom and sorting settings from the live model.

3 days
0.5 daytypical range5 days

Mass flow, one bloom day

Band widths to scale, except the dry-matter zoom

Salt-curing adds food-grade salt that is not counted here. The drained water is the jellyfish's own seawater and goes back to sea with the screen wash water. Compost needs a carbon source (C:N is 3.6), such as date-palm fronds, and the salt washed out first.

Where the screens fail

Every bloom mass and arrival window, run through the same model with the current screens, start mode and face limit. The dotted danger line marks where at least one intake first holds more than the face limit.

Peak load on the worst intake

No backlogBacklog under limitOver the limit

Screens per unit to stay under the limit

Model assumptions

A mass model of one bloom day at all four intakes, minute by minute. Sourced values are named; everything else is a team assumption and says so.